6E 697 Flight Status

6E 697IndiGo
DEPARTURE
12 MINS DELAY
Coimbatore (CJB)
Coimbatore Airport
Gate Number - NA
ARRIVAL
10 MINS DELAY
Mumbai (BOM)
Chhatrapati Shivaji International Airport, Terminal 2
Baggage Belt - NA
Scheduled departure
18:10
11 Aug 2026
Actual departure
18:22
11 Aug 2026
ARRIVED
2h:3m
Scheduled arrival
20:15
11 Aug 2026
Actual arrival
20:25
11 Aug 2026
Flight Performance
On time82.8%
Based on past 30 days data.
Avg. Punctuality
82.8%
Avg. Departure Time
18:17
Avg. Arrival Time
20:18
Weather at Mumbai
27.6 °C
Rain
Precipitation: 10.43%
Humidity: 78%
Wind: 29.9km/h
Aircraft
Airbus A321 N
3-3 Layout
Seating
28 inches legroom
Wide Seat
Info Unavailable
Amenities
BeveragesBeverage Available
Disclaimer: Please re-confirm any change in flight timing with your airline and reach the airport 3 to 4 hours before your flight departure time. MakeMyTrip tries its best to give you an accurate flight timing and tracking information, and shall have no accountability whatsoever, for any loss amounting from inconsistency in the above information.

Top Flights From Mumbai to Coimbatore

  • Airline
  • From

    To

  • Cheapest Fare
Air India

₹ 22,822

Air India

₹ 22,822

Air India

₹ 35,276

Air India

₹ 52,943